Monday, December 6, 2010

Residential Construction Processes

The following pictures are the residential construction site that I visited from July 2010 to December 2010.
I was able to see from the F.D. to roofing system. The construction process was pretty fast during summer. After they completed F.D. walls, joist was installed. After joist, they started installing floor sheathing with sheathing material which is called Advantech. Framing was followed. And then, pre-fabricated Trusses were installed like other residential buildings. For the roof system, it was separated two roofs as behind and  front-side.  The back-side of the roof is shingles and the front roof is metal.

No comments:

Post a Comment